2.0 MW Interior UPS skid
Location(s)
Numerous Locations
Dimensions
10' x 40'
Power
2.0 MW
Highlights
100+ units deployedTactics Employed
This project required a focus on scalable blocks and logistics. The product was deployed in seven states, with no issues. Having a fully-developed product block for the site team to coordinate around simplified the entire effort.
Lessons Learned
Scope touch points are critical. This has an RAF surrounding it, so the details can make or break success on site. Spending extra time coordinating those points saves a lot of panic later in the project.